• Work
    • Project Types
    • Sustainable
    • Community
    • Commercial
    • Daycares
    • Education
    • Indigenous
    • Heritage
    • Institutional/Healthcare
    • Interiors
    • Residential
  • Sustainability
  • About
    • Who we are
    • Our Team
  • News
  • Contact
prairie architects inc.
  • Work
    • Project Types
    • Sustainable
    • Community
    • Commercial
    • Daycares
    • Education
    • Indigenous
    • Heritage
    • Institutional/Healthcare
    • Interiors
    • Residential
  • Sustainability
  • About
    • Who we are
    • Our Team
  • News
  • Contact
IMG_9189.jpg IMG_9744.jpg Enscape_2025-01-29-15-56-28.png

École Communautaire Gilbert-Rosset Addition

location 
180, avenue Bériault
Winnipeg, Manitoba, CA

client 
Division scolaire franco-manitobaine (DSFM)

consultants 
S / Wolfom Eng. Ltd.
M / KGS Group
E / KGS Group
C / KGS Group

contractor 
LCL Construction Ltd.

area 
9194 sf

cost 
$7.3 Million

status
Completed 2024

École Communautaire Gilbert-Rosset, in La Division scolaire franco-manitobaine (DSFM), was created in 1998 when a group of local parents bought the first three building modules and started their own school in Saint Claude. Additional portable buildings were added in 2001, 2002, and 2008, with all but the last portable connected with an interior link. The schools current enrolment is around 50 children and fluctuates between 40-75 children from kindergarten to Grade 12. Each portable is one room classroom with combined grades of 2 to 6 students per grade and had previously used the towns english school's gym for physical education.

La Division DSFM engaged Prairie Architects to evaluate alternative methods for construction of a gymnasium addition and related ancillary space and concluded that a conventional concrete block approach suited a long-term Phase 1 investment with a future phase to replace the existing school’s grouping of interconnected wood-frame constructed buildings. The school addition includes a gymnasium and ancillary spaces for the gym, such as change rooms, a gym office, equipment storage, a small library and interconnected resource / guidance room, a kitchen, new public washrooms for the whole school, and a 2nd floor mechanical and electrical room. The scope of work also included renovation of the existing administration office and staff room. The project was successfully completed ready for the 2024 school year.

 
View fullsize IMG_9189.jpg
View fullsize IMG_9744.jpg
View fullsize IMG_9749.jpg
View fullsize IMG_9757.jpg
View fullsize Enscape_2025-01-29-15-56-28.png
View fullsize IMG_9743.jpg
IMG_9743.jpg
View fullsize A2-02-New Construction - Main Floor Plan.jpg
View fullsize A2-03-New Construction - Second Floor Plan.jpg

©2024 Prairie Architects