• Work
    • Project Types
    • Sustainable
    • Community
    • Commercial
    • Daycares
    • Education
    • Indigenous
    • Heritage
    • Institutional/Healthcare
    • Interiors
    • Residential
  • Sustainability
  • About
    • Who we are
    • Our Team
  • News
  • Contact
prairie architects inc.
  • Work
    • Project Types
    • Sustainable
    • Community
    • Commercial
    • Daycares
    • Education
    • Indigenous
    • Heritage
    • Institutional/Healthcare
    • Interiors
    • Residential
  • Sustainability
  • About
    • Who we are
    • Our Team
  • News
  • Contact
200903-LLR-5144-Edit.jpg 200903-LLR-5179-Edit.jpg 200903-LLR-5195-Edit.jpg 200903-LLR-5209.jpg

Arthur A. Leach School Additions and Renovations

location 
1827 Chancellor Dr., Winnipeg, Manitoba, Canada 

client 
Public Schools Finance Board
Pembina Trails School Division  

consultants
S/ Wolfrom Eng. Ltd
M+E+C/ KGS Group
EL/Prairie Elevator & Lift Consultants

contractor 
Gardon Construction

area 
Reno 5500 ft2
New 1300 ft2

cost 
$3.3 million

status
Completed in 2020 

photography
Lindsay Reid

The Arthur A. Leach School was built in 1974 with 4 different levels and no elevator. The scope of this project includes the addition of a new 4500lb elevator to travel from the main floor to the intermediate basement and second floors on one wing as well as a new south entry link to connect the previously separated basement and second floor wings which were separated by the 1½ storey library that prohibited the travel of students from one side of the school to the other.

In the 1980’s 2 lifts were added to the library to allow students to travel from one side of the school through the library to the other side.  The project also included the removal of the lifts and the creation of new Universal Toilet Rooms on each floor, improving the accessibility of the school. The school Division also funded the relocation of the lifeskills suite to the main floor, which resulted in the creation of 2 classrooms where lifeskills had been formerly located. The south entry link was created from found space in the mechanical mezzanine and includes an exit stair and lower entry that is landscaped to provide access at grade. We worked with the PSFB and the Division to find a cost effective solution that would most benefit the modernization of this school, developing a number of options for the elevator location, and outlining a phasing plan to ensure the school remained operational and safe during construction.

 
View fullsize AAL-Front Entry.jpg
View fullsize AAL-Elevator.jpg
View fullsize AAL-vestibule.jpg
View fullsize AAL-elevator door.jpg
View fullsize AAL-elevator corridor.jpg
View fullsize AAL-Lifeskills kitchen.jpg
View fullsize AAL-Lifeskills.jpg
View fullsize AAL-Grooming.jpg
View fullsize AAL-south entry.jpg
View fullsize AAL-exit stair.jpg
View fullsize AAL-south link.jpg
View fullsize AAL-link from main.jpg
View fullsize AAL-second floor link.jpg